RES-03 // FEASIBILITY & VIABILITY STUDIES

Bankable Technical, Architectural & Economic Feasibility Assessments

Before committing capital to a new data center, core banking overhaul, nationwide network rollout, or sovereign AI platform, Dulo Tech delivers rigorous technical, operational, regulatory, and financial (NPV/IRR/TCO) feasibility dossiers.

Technical & Architectural Viability 5-Year CapEx/OpEx & NPV/IRR Models Site, Power & Telecom Assessments Board, Bank & Donor Bankable Reports
Bankable Technical, Architectural & Economic Feasibility Assessments FEASIBILITY STUDIES // TECHNICAL & ECONOMIC
NODE: DT-KE-904-NBO Bankable CapEx/OpEx Dossiers | Risk Quantified
5-Yr
CapEx, OpEx, NPV & IRR Modeling
100%
Board & Investment Committee Ready
360°
Technical, Legal & Operational Vetting
Zero
Vendor Sales Bias
INVESTMENT-GRADE CERTAINTY

Independent Engineering & Financial Rigor for Capital Technology Decisions

Major technology initiatives—such as constructing a Tier-III/IV data center, replacing a core ERP, or launching a digital financial service—carry high capital risk if sized on optimistic assumptions.

Dulo Tech's multidisciplinary feasibility teams (combining TOGAF architects, Uptime ATD facility engineers, CISA risk auditors, and technology financial analysts) produce bankable feasibility studies that satisfy corporate Boards, commercial lenders, Treasury committees, and international DFI/donor boards.

Multi-Scenario Technical Architecture & Capacity Sizing
5-to-10-Year Total Cost of Ownership (TCO), NPV, IRR & Payback Modeling
Regulatory, Environmental (ESIA), Power Grid & Cybersecurity Risk Matrix
Independent Engineering & Financial Rigor for Capital Technology Decisions
BANKABLE FEASIBILITY DOSSIER // NPV & TCO SLA: 99.999%
SIX FEASIBILITY ASSESSMENT DIMENSIONS

The TELOS+ Framework Applied to Enterprise Technology

Every Dulo Tech Feasibility Study evaluates six exhaustive dimensions to ensure zero blind spots.

FEASIBILITY STUDY METHODOLOGY

Six Analytical Rigor Standards We Enforce

Why institutional investors and boards trust Dulo Tech feasibility reports.

FSM-01

Three-Scenario Sensitivity Analysis

Modeling Conservative, Baseline, and Aggressive growth/cost scenarios to test how the project performs under stress.

STRESS TESTED
FSM-02

Empirical Market BOQ Benchmarking

Using real, current Tier-1 OEM and civil/MEP contractor pricing from our active procurement database—never guesswork.

REAL OEM PRICING
FSM-03

Build vs. Buy vs. Hybrid Comparison

Objective side-by-side scoring of in-house build, commercial off-the-shelf (COTS), SaaS, and hybrid alternatives.

OBJECTIVE OPTIONS
FSM-04

Quantitative Risk Register (Monte Carlo)

Assigning probability and financial impact weights to technical, vendor, and regulatory risks with funded mitigation plans.

MONTE CARLO RISK
FSM-05

Laboratory Benchmark Verification

Where required, running live throughput or thermal simulations in our Nairobi lab to validate critical assumptions.

LAB VERIFIED
FSM-06

Executive Board Defense Presentation

In-person presentation and Q&A defense of the feasibility dossier before your Board of Directors or Investment Committee.

BOARD DEFENSE
FEASIBILITY DELIVERABLES MATRIX

Study Types, Timelines & Core Dossier Sections

Standardized scope for Dulo Tech technical and economic feasibility engagements.

Study Code Feasibility Study Type Primary Scope Typical Timeline Core Dossier Output
FS-01 Data Center Site & Build Study Site Selection, 2N Power, PUE & Tier III/IV CapEx 3 – 6 Weeks Site Audit, Concept CAD & 10-Yr TCO Model
FS-02 Core Banking / ERP Overhaul Study Build vs Buy, Migration Risk & 5-Yr ROI 3 – 5 Weeks Vendor Matrix, TCO Model & Cutover Charter
FS-03 Cloud vs On-Premise Repatriation Workload Telemetry, FinOps & Data Sovereignty 2 – 4 Weeks 36-Month Cost Comparison & Hybrid Blueprint
FS-04 National / Campus Network Rollout Fiber, SD-WAN, Wireless & Last-Mile Economics 3 – 5 Weeks RF/Fiber Topology, BOQ & Rollout Schedule
FS-05 AI / Digital Product Venture Study Technical Architecture, Unit Economics & ODPC 2 – 4 Weeks Bankable Investment Memo & PoC Roadmap
TECHNICAL KNOWLEDGE BASE

Frequently Asked Engineering & Procurement Questions

Direct answers from Dulo Tech Limited's Principal Systems Architects, CSOC Directors, and Institutional Procurement Officers at Mirage Towers, Nairobi.

Yes. Our studies are structured to international project finance and public investment standards—complete with discounted cashflow (NPV/IRR), sensitivity tables, risk registers, and certified engineering sign-offs.
Yes. Our Cloud vs. On-Premise Feasibility Study models exact compute, storage, bandwidth egress, power/cooling, and licensing costs over a 3-to-5-year horizon to show the exact crossover point for every workload.
We evaluate candidate buildings or land parcels for KPLC dual-substation power capacity, multi-carrier dark fiber diversity, structural slab loading (kN/m²), flood/flight-path hazards, ambient wet-bulb temperatures, and Tier III/IV spatial layout.
Yes. We can deliver a 100% vendor-neutral Feasibility Study and Tender RFP Specification pack that allows your procurement board to run a competitive open tender.
Because Dulo Tech operates an active ICT Supply and Data Center Engineering division in Nairobi, our CapEx and OpEx figures are anchored in real-time OEM deal pricing and local MEP bills of quantities (typically within ±5–10% accuracy).
Most focused feasibility studies are completed within 2 to 5 weeks depending on the number of physical sites or legacy systems involved.
Submit your project outline via the form below or email info@dulotech.co.ke for a formal Terms of Reference (ToR) proposal.
Need direct architectural clarification? Call +254 799 000 595
DIRECT DISPATCH DESK

Request Technical Briefing or Tender BOQ Quote

Routed directly to our Senior Engineering Board at 12th Floor, Mirage Towers, Westlands, Nairobi.

24/7 Support

DULO TECH LIMITED

Excellence in Enterprise ICT, Cybersecurity, Supply & Tier-IV Data Center Engineering across Africa.

12th Floor, Mirage Towers, Waiyaki Way, Westlands, Nairobi
Mon–Fri: 8:30am–5:00pm EAT
NOC & SOC: Active 24/7/365
Available | Call Now / WhatsApp